Current Project
Owner: | | Pajaro Valley Water Management Agency (PVWMA) |
Project: | Blend Well Pipeline Project |
Location: | Watsonville, CA |
Construction Cost: | $840,000 |
Services provided: | Construction Management |
Client: | PVWMA |
Description
Performed constructability and bidability review for the construction of 2,700 feet of 24-inch steel, recycled water pipeline, having a construction value of $840,000.
Current Project
Owner: | | Pajaro Valley Water Management Agency (PVWMA) |
Project: | K1 Pipeline Project |
Location: | Watsonville, CA |
Construction Cost: | $2,900,000 |
Services provided: | Construction Management |
Client: | PVWMA |
Description
Performed constructability and bidability review for the construction of 6,700 feet of 24-inch HDPE, recycled water pipeline, having a construction value of $2,900,000.
Completed Project
Owner: | | San Francisco PUC |
Project: | WSIP San Joaquin Regional Projects
Tesla Water Treatment Facility |
Location: | Tracy, CA |
Construction Cost: | $84,000,000 |
Services provided: | Lead QA Inspector |
Client: | PMA Consultants LLC |
Description
Lead QA Inspector for the construction of the $84,000,000 Tesla Treatment Facility project, a design-build project. The Tesla Treatment Facility will be a new 315-MGD water treatment facility using ultra-violet (UV) disinfection and new chemical feed facilities to treat cryptosporidium. The project consists of UV Reactor Building having twelve (12) 48-inch UV reactors, two (2) standby 2000 kW generators, Chemical Storage Building having three (3) sodium hypochlorite storage tanks and two (2) hexafluorosilicic acid storage tanks, Operations Building, Valve Vault with one (1) each 60-inch, 66-inch, 78-inch and 90-inch butterfly valves, new inlet and outlet piping ranging from 84-inch to 144-inch welded steel pipe, two (2) 144-inch butterfly valves, and two (2) 84-inch butterfly valves.
Completed Project
Owner: | | San Francisco PUC |
Project: | WSIP San Joaquin Regional Projects
SJPL4 West Segment |
Location: | Vernalis, CA |
Construction Cost: | $48,000,000 |
Services provided: | Lead QA Inspector |
Client: | PMA Consultants LLC |
Description
Lead QA Inspector for the construction of the $48,000,000 West Segment Pipeline consisting of 11 miles of 78-inch welded steel pipe having an epoxy lining and polyethylene tape coat, one bore across Highway 33, one bore across I-5, one bore across I-580, one bore across Chrisman Road, crossing of the Delta-Mendota Canal, crossing of the California Aqueduct, pipe fabrication inspection, corrosion system, and environmental mitigation.
Completed Project
Owner: | | San Francisco PUC |
Project: | WSIP San Joaquin Regional Projects
SJPL4 East Segment |
Location: | Oakdale, CA |
Construction Cost: | $45,000,000 |
Services provided: | Lead QA Inspector |
Client: | PMA Consultants LLC |
Description
Lead QA Inspector for the construction of the estimated $45,000,000 East Segment Pipeline consisting of 6.7 miles of 78-inch welded steel pipe having an epoxy lining and polyethylene tape coat, three valve structures, one overflow tower vent, pipe fabrication inspection, corrosion system, and environmental mitigation.